Aerial view of the Atlantic Seaboard apartment blocks below Lion Head

Waterproofing Sea Point

Waterproofing in Sea Point starts with the concrete, not the membrane. Six decades of salt air have left most blocks here with a slab problem underneath the leak. Free inspection, two-year written guarantee.

  • 18 years in trade
  • Two-year written guarantee
  • Free inspection

How It Works

  1. 1

    Free site inspection

    Roof surveyed, slab condition assessed, not just the membrane.

  2. 2

    Written quote before work starts

    Concrete repair costed separately from waterproofing, so trustees and owners can see exactly what is structural.

  3. 3

    Work completed, system specified

    Sequenced around occupied units, with access arrangements agreed in advance.

  4. 4

    Guarantee and follow-up

    Two-year written guarantee, plus a check after the first winter.

Sea Point work is mostly apartment blocks, which means dealing with trustees, managing agents and owners rather than one homeowner. We provide written reports and photographs suitable for a body corporate meeting, because that is how these decisions actually get made.

The Membrane Is Failing From Underneath

This is the thing about Sea Point that most quotes miss entirely.

Reinforced concrete protects the steel inside it chemically. The cement alkalinity forms a passive layer on the reinforcement that stops it rusting. Break that protection and the steel corrodes, and corroding steel expands to several times its volume, cracking the concrete from within and pushing it off in flakes.

Near the sea, the thing that breaks the protection is chloride. Salt carried on the wind penetrates the concrete over years, reaches the reinforcement, and destroys the passive layer directly, even where the concrete is otherwise sound. This is chloride-induced corrosion, and Sea Point, sitting directly on the Atlantic with a dense stock of concrete-framed blocks built from the 1950s onward, is a textbook case.

The result on a roof is that the slab surface is delaminating. You can lay a flawless torch-on membrane on it, and within a few years the membrane lifts, not because the membrane failed but because what it was bonded to came away.

This is why blocks here get waterproofed repeatedly and keep leaking. Each contractor addresses the membrane. Nobody addresses the slab.

Parapets are worse than the roof field. They are exposed on both faces and on top, they take the full force of winter fronts, and they typically have thin cover to the reinforcement. On most Sea Point buildings we survey, the parapets are further gone than the deck.

Flat Communal Roofs and Who Is Responsible

Sea Point building stock is predominantly multi-storey blocks with flat concrete roofs, which creates a specific set of problems.

The roof is common property, so a leak into a top-floor flat is a body corporate matter rather than an owner matter, and the decision to spend runs through trustees and a budget. That process takes time, and meanwhile the water keeps coming in.

Flat roofs on older blocks have lost their falls. Decades of slab deflection, patched screeds and relocated outlets mean water sits rather than draining. Standing water on a chloride-affected slab accelerates everything.

Outlets and overflows. Many older blocks have too few outlets for the roof area and no overflow provision, so a blocked outlet during a winter front puts water over the upstands.

Plant, aerials, satellite dishes and later service runs all penetrate the membrane, usually fixed by whoever installed them with no waterproofing detail at all.

Balconies are a second front. Every balcony on the building is a small flat roof over somebody living space, with the same chloride exposure and the same spalling. Most inter-unit leaks in Sea Point blocks are balconies, not the roof.

Salt, Wind and the Promenade Front

The exposure gradient across Sea Point is real and it matters for specification.

Buildings on the Beach Road and Promenade frontage take direct salt spray and the full force of north-westerly winter fronts off the Atlantic. Buildings a few streets back, toward Main Road and the upper slopes, still sit in salt-laden air but without the direct spray loading.

Winter fronts arrive from the north-west at 50 to 65kph, driving salt water horizontally onto the seaward elevations. Exposure is therefore not even across a building. The seaward parapet, the seaward balconies and the north-west elevation deteriorate visibly faster than the sheltered sides of the same block.

The summer south-easter is dry and does not put water in, but it lifts poorly bonded membrane edges, abrades exposed surfaces with wind-carried particles, and works at anything already loose.

Everything metal corrodes faster here, including gutters, brackets, fixings, balustrade posts and handrail bases. Balustrade fixings penetrating a balcony surface are a frequent leak point and a frequent corrosion point at once.

What We Do Differently on a Sea Point Building

Survey the slab, not just the surface. Delaminated concrete sounds hollow when tapped, and it looks completely sound. Mapping it before quoting is the difference between a repair that lasts and one that repeats.

Quote concrete repair separately. Trustees need to see what is structural repair and what is waterproofing, because the two have different lifespans and different implications for the building reserve fund.

Survey the whole roof, not the leaking corner. Visible spalling is usually the leading edge of a larger affected area that has not flaked yet. Pricing only the visible damage means coming back.

Written reports with photographs, suitable for presenting at a trustees meeting.

Why Choose Us in Sea Point

  • We inspect before we quote

    Nobody prices a roof from a photograph or a phone call. We get on the roof or into the roof void, establish what is actually wrong, and quote from that.

  • Preparation is quoted separately

    Substrate repair, falls correction and strip-off appear as their own line items. That is the part that determines whether the work lasts, and the part most quotes hide.

  • We say when repair is the cheaper answer

    Plenty of roofs quoted for replacement need a day of repairs. We tell you which yours is, including when it means a smaller invoice for us.

  • Two-year written guarantee, in writing

    Minimum two years on our workmanship, with the scope set out on the quote before you sign. We check the work again after the first winter.

Waterproofing in Sea Point FAQs

How much does waterproofing cost in Sea Point?

The waterproofing is usually the smaller figure. Concrete repair is the variable, and it is established by survey rather than by eye. We quote the two separately so trustees can see exactly what is structural.

Why does our block keep leaking after being waterproofed twice?

Almost always because the slab underneath is spalling. Salt-driven corrosion of the reinforcement lifts the concrete surface, and any membrane bonded to it comes away. The concrete has to be repaired before the waterproofing.

What is causing the concrete to flake off our parapets?

Chloride from salt air reaching the steel reinforcement and rusting it. Rust expands and pushes the concrete off. Parapets go first because they are exposed on three faces and usually have thin cover to the steel.

Water is coming into my flat from the flat above. Is that the roof?

If you are not on the top floor, usually not. It is most often the balcony above, which is a small flat roof over your ceiling with the same spalling and membrane problems. We establish the source in writing.

Who pays, the body corporate or the owner?

That depends on your scheme rules and registered plans, and we are not the right people to advise on it. What we provide is a written diagnosis with photographs establishing exactly where the water enters, which is what the decision gets made on.

Can you work on an occupied block?

Yes. Roof and parapet work on an occupied building needs sequencing, access arrangements and notice to residents, and we set that out in the programme before starting.

Why is one side of our building worse than the other?

Because winter fronts come from the north-west off the Atlantic at gale speeds. The seaward elevations take driven salt water that the sheltered sides never see, so they deteriorate considerably faster.

Our flat roof holds water after rain. Is that the problem?

It is part of it. Standing water accelerates chloride penetration and every waterproofing system performs worse under it. On older blocks the falls have usually been lost, and correcting them is part of doing the job properly.

How long does a full roof and parapet job take?

Longer than a straight membrane job, because concrete repair needs curing time before waterproofing can start. We give trustees a written programme with the sequence and the realistic duration.

Waterproofing in Sea Point, quoted in writing

Free site inspection, a written quote before any work starts, and preparation costed separately from the waterproofing.

  • We inspect before we quote, on the roof or in the roof void
  • Preparation and substrate work itemised separately
  • Two-year written guarantee
  • A check after the first winter
068 890 3548

Request a quote

Tell us what is happening and we will arrange the inspection.

No charge for the inspection, and no obligation.

Call for a free inspection