Aerial view of Atlantic Seaboard apartment blocks below Lion Head and Table Mountain

Commercial Waterproofing Cape Town

Commercial waterproofing in Cape Town for blocks of flats, body corporates and business premises. Inspected first, reported in writing with photographs, and quoted in items so trustees and owners can decide and budget. Free inspection, two-year written guarantee.

Written for the People Who Decide

On a block of flats or a business premises, the person who reports the leak, the people who approve the spend and the people who pay are often different. Most of them will never go onto the roof.

So the report matters as much as the repair. After inspecting, we write up what we found, with photographs, the cause of each problem and the work it needs, ranked by urgency. The quote is itemised to match: membrane, substrate repair, detailing and access, each priced separately.

That gives trustees something they can decide on and compare like for like. Three single-figure quotes to “waterproof the roof” are usually three different scopes, and the cheapest is often the one that left out the concrete repair.

Common Property, Exclusive Use and the Leak Between Them

Most leaks in a block cross a boundary. The roof is common property and the flat below it is not. The balcony slab may be common property while the tiles on it are an exclusive use area. The water does not care, but the question of who pays depends on it.

We do not give legal or body corporate advice. What we do is establish where the water is actually coming from, in writing, so trustees and owners can settle responsibility on facts rather than assumptions. On a building where the leak in one flat comes from the balcony of the flat above, that document saves months of argument.

Big Roofs, Plant and Box Gutters

Commercial roofs fail in the same places as house roofs. There are just more of them.

Flat roofs on blocks lose their falls over decades, have too few outlets for their area and often no overflow, so a blocked outlet in a cold front puts water over the upstands.

Plant and services. Aircon units, lift motor rooms, aerials, satellite dishes and solar arrays, each installed by a different contractor, each fixed through the membrane, and rarely detailed back properly afterwards.

Large metal roofs on factories and warehouses can carry thousands of fixings and long sheet runs, and thermal movement works at every one of them.

Box gutters sit inside the building line. When one blocks or overflows, the water goes into the building, not off the edge, which is why they need checking every year.

Concrete. Near the coast, spalling slabs and parapets lift membranes from below. The concrete is repaired before any waterproofing goes over it.

Planning Around a Budget and a Season

Roughly 70% of Cape Town rain falls between June and September, and most waterproofing systems need a dry substrate. The work belongs in the dry months, with March and April the best window before the first front.

For a body corporate, that means starting earlier than feels necessary. The inspection and quote need to land in time for approval, so the work happens while the roof is still dry. A scheme that waits for the first leak of winter usually ends up paying for emergency repairs instead.

Where the budget will not cover everything in one year, we split the work so the items causing damage come first and the rest follows.

How It Works

  1. 1

    Free site inspection

    Roofs, parapets, balconies and outlets inspected, with access arranged through the managing agent or building manager.

  2. 2

    Written report and quote

    Findings with photographs, the cause of each leak, and the work itemised and prioritised so it can be budgeted and staged.

  3. 3

    Work carried out

    Planned with the building manager around residents or tenants, with the roof left watertight at the end of every day.

  4. 4

    Guarantee and follow-up

    Two-year written guarantee, plus a check after the first winter.

What Commercial Waterproofing Costs

  • Roof area and system specified.The flat roof of a block and the metal roof of a warehouse are priced on different things.
  • Substrate condition.Spalling concrete, lost falls and wet screed are repaired before any membrane, and quoted separately.
  • Access.Scaffolding, getting materials to roof level, and working around an occupied building.
  • Detailing count.Plant plinths, aircon units, aerials, outlets and parapets.
  • Staging.Splitting the work into phases means setting up more than once, and we show you what that adds.

Every item is priced separately, so trustees can compare quotes on the same scope rather than on a single total.

Get a written quote

Why Choose Us

  • We inspect before we quote

    Nobody prices a roof from a photograph or a phone call. We get on the roof or into the roof void, establish what is actually wrong, and quote from that.

  • Preparation is quoted separately

    Substrate repair, falls correction and strip-off appear as their own line items. That is the part that determines whether the work lasts, and the part most quotes hide.

  • We say when repair is the cheaper answer

    Plenty of roofs quoted for replacement need a day of repairs. We tell you which yours is, including when it means a smaller invoice for us.

  • Two-year written guarantee, in writing

    Minimum two years on our workmanship, with the scope set out on the quote before you sign. We check the work again after the first winter.

Commercial Waterproofing FAQs

How much does commercial waterproofing cost in Cape Town?

It depends on roof area, the system, the condition of the concrete underneath, access and how much detailing there is. We inspect first and quote in items, so a body corporate can see what each part costs and stage the work if the budget needs it.

Do you work with managing agents and trustees?

Yes. We arrange access through the managing agent or building manager, and the report and quote are written for trustees who were not on the roof, with photographs of each problem and what it needs.

Can the work be split over two budget years?

Usually. We prioritise the items, so the leaks and the parts doing the most damage come first and the rest can follow the next year. Splitting the work means setting up twice, and we show you what that adds.

Can you give us a report for the AGM?

Yes. A written report with photographs, the cause of each problem and the work ranked by urgency, which is what trustees need when putting a waterproofing budget to owners.

Do you do factory and warehouse roofs?

Yes. Large metal roofs fail the same way house roofs do, at fixings, laps, flashings and box gutters, at a much larger scale. Box gutters need particular attention, because when one overflows it overflows inside the building.

Will residents or tenants be disrupted?

As little as we can manage. The work is planned with the building manager so residents know when we will be on the roof and where materials will be, and the roof is left watertight at the end of every day.

Should we waterproof the whole roof or just repair the leaks?

That depends on the membrane across the roof, not the number of leaks. Sound membrane with local failures gets repaired. Brittle, blistered membrane holding water over large areas turns patching into an annual cost, and a full system is cheaper over the life of the building. The report says which.

Who is the guarantee issued to?

Whoever commissions the work, usually the body corporate or the building owner. It is two years minimum in writing on our workmanship, with the scope set out on the quote, and we come back to check after the first winter.

When should a body corporate book waterproofing?

The work belongs in the dry months, ideally March and April. The inspection and quote should come well before that, so there is time for trustees to approve the spend and for the work to be scheduled while the roof is still dry.

Free inspection, written quote, no obligation

We come out, establish what is actually wrong, and put it in writing with preparation costed separately from the waterproofing.

  • We inspect before we quote, on the roof or in the roof void
  • Preparation and substrate work itemised separately
  • Two-year written guarantee
  • A check after the first winter
068 890 3548

Request a quote

Tell us what is happening and we will arrange the inspection.

No charge for the inspection, and no obligation.

Call for a free inspection